Most of our clients have never built before. The process we've developed over dozens of projects on Koh Tao is designed to make that reality manageable — and to protect them at every stage.
Phase 1: Site discovery
We start with a site visit before any fee is discussed. If the plot doesn't work for the brief — topographically, legally, or logistically — we say so immediately. This saves everyone time.
Phase 2: Concept design
Once we have a site and a brief, we produce a concept package: site plan, floor plans, key sections, and a 3D model. This is where client feedback is most valuable and least expensive to incorporate.
Phase 3: Technical design and permits
We produce full construction drawings and manage the permit process. This phase typically takes 2–4 months. We don't rush it — errors in technical drawings are the most expensive kind.
Phase 4: Construction
We project-manage all construction on-site. Our site manager is present daily. We send weekly photo reports to clients wherever they are in the world.
Phase 5: Handover
Handover includes a full snagging walkthrough, appliance manuals, maintenance schedule, and contractor warranty documentation. We remain available for post-handover queries for 12 months.